NO. |
CLIENT |
D
E S C R I P T I O N |
CONTRACT NUMBER |
COMMENCED/ COMPLETED MO.-YR. |
|
|
|
|
|
|
|
1 |
S. ARAMCO C&IFD/UPD |
CONSTRUCTION OF AIR-CONDITIONING PLANT NO. 7 AND EXPANSION OF AIR-CONDITIONING PLANT NO. 1 & 6. Installation of 7 X 600-Tons of chiller units. (All permanent materials supplied by Saudi ARAMCO).
|
7491/00 DHAHRAN |
12-76 04-78 |
|
2
|
PHILLIPS HOLZMAN |
EARTH FILL AT DAMMAM PORT |
DAMMAM |
02-77 06-77 |
|
3 |
VANHAUTEM DREDGER |
EARTH FILL AT DAMMAM PORT |
DAMMAM |
02-77 06-77
|
|
4 |
S. ARAMCO UPD
|
TRENCH EXCAVATION IN NORMAL/ ROCKY SOIL |
13080/00 DHAHRAN |
10-77 06-78 |
|
5 |
S. ARAMCO LCDD |
INITIAL DEVELOPMENT OF HOME-OWNERSHIP LOTS, INCR. I, NORTH DHAHRAN, Installation of water distribution systems, waste-water collection systems and construction of roads.
|
13082/00 DHAHRAN |
11-77 09-78 |
|
6 |
S. ARAMCO UPD |
CONSTRUCTION OF AIR- CONDITIONING PLANT No. 8 AND EXPANSION OF AIR CONDITIONING PLANT No. 5. Installation of 3 X 600-Ton of chiller units (All permanent materials supplied by Saudi ARAMCO) |
13143/00 DHAHRAN |
12-77 05-79 |
|
7 |
S. ARAMCO UPD |
CONSTRUCTION OF AIR-CONDITIONING PLANT No. 1. Installation of 2 X 600-Ton of chiller units. (All permanent materials supplied by Saudi ARAMCO)
|
13144/00 ABQAIQ |
12-77 02-79 |
|
8 |
S. ARAMCO UPD
|
INSTALLATION OF UNDERGROUND CHILLED WATER SUPPLY AND RETURN LINES. |
13515/00 DHAHRAN |
03-78 06-78 |
|
9 |
S. ARAMCO UPD
|
CONSTRUCTION
OF PERCOLATION FIELD AND INSTALLATION OF SEWER OUTFALL. |
13297/00 DHAHRAN |
10-78 10-79 |
|
10. |
S. ARAMCO UPD
|
EXTENSION OF ICE PLANT. |
13597/00 DHAHRAN |
10-78 10-79 |
|
11.
|
S. ARAMCO UPD
|
SEWER OUTFALL-Installation of 42” diameter GRE sewer line 10 meters in depth. |
15206/00 UTHMANIYAH |
05-79 05-80 |
|
12. |
S. ARAMCO |
MAINTENANCE
OF POWER PLANTS AT
VARIOUS LOCATIONS.
|
16242/00 VARIOUS LOCATIONS |
05-79 05-80 |
|
13. |
S. ARAMCO ABGS
|
INSTALLATION
AND COMMISSIONING OF 450 AIR-CONDITIONING UNITS IN SEVEN (7)
SCHOOLS. |
13672/01 DAMMAM |
08-79 05-80 |
|
14. |
S. ARAMCO LCCD |
INITIAL DEVELOPMENT OF HOME OWNERSHIP LOTS INCR. I, AL-HASA, Installation of water and sewer network and roads.
|
13740/01 AL-HASA |
01-80 06-81 |
|
15. |
S. ARAMCO UPD |
INSTALLATION
OF 24” DIA GRE GRAVITY SEWER LINE UP TO 8 METERS IN DEPTH
|
13777/00 DHAHRAN |
02-80 08-80 |
|
16. |
S. ARAMCO UPD |
CONSTRUCTION
OF WATER BOOSTER STATIONS. |
14022/02 DAMMAM/ KHOBAR |
04-80 07-81 |
|
17. |
S. ARAMCO UPD
|
FLOW
LINES FOR NINE (9)
WATER WELLS AT QATIF WATER BOOSTER
STATION. |
13823/00 QATIF |
06-80 03-81 |
|
18. |
S. ARAMCO UPD
|
FIRE FIGHTING SYSTEMS. Installation of 20,000 feet of pipe mains and construction of two (2) Pump Stations. |
14073/00 DHAHRAN |
07-80 04-81 |
|
19. |
S. ARAMCO UPD |
FINAL
EFFLUENT SPRAY IRRIGATION
FIELD.
|
29029/01 DHAHRAN |
07-81 01-82 |
|
20. |
S. ARAMCO |
SAUDI
ARABIAN GOVERNMENT OIL AND GAS PIPELINE CROSSING DIVERSION NO. 16.
|
28065/00 JUBAIL |
07-81 10-81 |
|
21. |
S. ARAMCO
|
PROCURE
AND CONSTRUCT WELL SERVICES MAINTENANCE
BUILDING. |
29032/00 MUBARRAZ |
09-81 09-82 |
|
22. |
S. ARAMCO LCDD |
INITIAL
DEVELOPMENT OF HOME-OWNERSHIP LOTS,
INCR. XII, RAHIMAH
|
29030/01 RAHIMAH |
11-81 12-82 |
|
23. |
S. ARAMCO UPD |
EXPANSION
OF WATER BOOSTER PUMP STATION AT
QATIF WELL FIELD |
29152/01 QATIF
|
05-82 02-83 |
|
24. |
S. ARAMCO UPD |
INSTALLATION
OF QRT-11 PARALLEL PIPE CROSSING AT TARUT BAY.
|
29099/00 TARUT BAY |
08-82 03-83 |
|
25. |
S. ARAMCO LCCD |
INITIAL DEVELOPMENT OF HOME OWNERSHIP LOTS, INCR. 5,6, & 7, NORTH DHAHRAN. Earthwork. Installation of water distribution networks, waste water collection systems, roads construction.
|
29063/00 DHAHRAN |
01-83 03-84 |
|
26. |
S. ARAMCO C&IFPD |
CONSTRUCTION
OF ICE PLANT, AC REPAIR WORKSHOP AND WATER DISTRIBUTION LINES.
|
29192/00 AL-HASA
|
01-83 04-84 |
|
27. |
S. ARAMCO UPD |
REPLACEMENT
OF WEST LOOP 20” DIAMETER WATER LINE.
|
29251/00 DHAHRAN |
04-83 03-84 |
|
28. |
S. ARAMCO LCDD |
SWCC-Installation of 20” diameter, cement- lined water lines.
|
29296/00 RAHIMAH |
06-83 12-83 |
|
29. |
S. ARAMCO RT&TPD |
QRT-12, QATIF RAS TANURA PIPELINE AND UPGRADE RAHIMAH BOOSTER STATION. Installation of 24”/30” diameter cement-lined internally and externally fusion-bonded epoxy coated, 80,000 lineal feet; cross-country pipeline partially on reinforced concrete foundations, partially on pile driven/girders, PIC launcher and receiver. Thrust boring at road crossing. Expansion and upgrade of Rahimah Water Booster Station.
|
29270/00 RAS TANURA |
03-84 05-85 |
|
30 |
PRIVATE CLIENT
|
CONSTRUCTION OF THE ABU-ADLA PALACE IN BALJURSHI. |
BALJURSHI |
1984 1986 |
|
31 |
S. ARAMCO SAP/C&IPD/ NACPD |
WATER AND SEWER IN NORTHERN RAHIMAH, Procure and Install VCP/PVC 30,000 LM of water and sewer lines including appurtenances; manholes, inspection chambers, Cleanouts, fire hydrants, valve boxes and valve chamber, sewer line service connections for 795 existing house.
|
29339/01 RAHIMAH |
04-84 03-86 |
|
32 |
S. ARAMCO SAP/C&IPD/NACPD |
COMPLETE DEVELOPMENT OF HOME-OWNERSHIP LOTS INCR. VI, PH. 2 HAZM SAFWA. Procure and construct/install waste water collection systems; water distribution systems; electrical and telephone systems, street lighting, sidewalks and paving.
|
29311/01 SAFWA |
04-84 02-86 |
|
33 |
S. ARAMCO CIPD/CPD |
INITIAL DEVELOPMENT OF HOME OWNERSHIP LOTS, AR-RABIYAH, NORTH DHAHRAN. Procure and install water, sewer and gas distribution systems.
|
29496/00 AR-RABIYAH DHAHRAN |
02-86 07-86 |
|
34 |
BALLAST NEDAM |
CONSTRUCTION
OF 18 VILLAS AT KING KHALID AIR BASE
|
W7027/AFF KHAMIS/ MUSHAYT
|
02-86 07-86 |